Installing Network Pro MULTI

Basic principles about installing and mounting the Network Pro MULTI.

The Network Pro MULTI must be installed and configured by trained and authorised personnel according to the instructions provided in the Network Pro Installation Guide. Otherwise your Warranty may be void. 

Key principles

  • Be sure to take into account the number of chillers that the Network Pro needs to collect data from when choosing the installation location.
  • We recommend the mounting location is at the top and slightly back from the front of the cooler, where it will be high up for the best signal quality, but out of sight of customers.
  • Be sure to avoid metal and other obstacles between the Network Pro and the devices being tracked as these can cause connection reliability issues.
  • Do not install the Network Pro within the HOT space of the chiller or compressor.
  • The installation location must be an area where the temperature remains between 0°C (32°F) and 40°C (104°F) to ensure the internal battery can be charged.
  • Do not install the Network Pro in an area where there is a risk of condensation or liquids.

For more model specific details refer to the Network Pro installation manuals.