Key phases for installing IoT hardware in the factory
This guide outlines essential phases for installing AoFrio’s IoT hardware (Monitor, SCS Controller, Gateway, and Network Pro ONE/Multi) into new coolers during OEM factory production.
NOTE: In the following phases we are assuming that the SIM cards inside any cloud-connected gateway devices are activated in the factory. If SIM activation is deferred (ie. not done in factory) until the cooler arrives at a final consumer location, we have added alternative actions below.
Installing IoT hardware in a new cooler
|
Phase |
Details |
|
|
Phase 0
|
Cellular planning: If installing a Gateway, Network Pro or SCS 800:
Product Manuals: Understand device-specific steps outlined in product manuals:
AoFrio support: If this is your first installation or if you have any questions, contact your AoFrio Customer Success Manager. |
|
|
Phase 1
|
More detail: Cradle Programmer - overview & download | Batch or bulk programming | Set up a cooler with an SCS Controller using Field app |
|
|
Phase 2 Mechanical install or mounting** |
Gateway, SCS 800, or Network Pro:
Monitor:
After hardware installation:
More detail in the user manuals: SCS Controller | Monitor | Network Pro | Gateway ** If using a Cradle, you may take some programming actions before mounting. |
|
|
Phase 3 Electrical & Pairing |
SCS 500/600 Controller:
Monitor:
More detail: Gateway | Network Pro ONE | SCS Controller | Monitor |
|
|
Phase 4 Power-on &
|
More detail: Gateway | Network Pro | SCS Controller | Monitor |
|
|
Phase 5 Software verification & connection troubleshooting
|
|
|
|
Phase 6 Pack-out & documentation
|
|
|
Database & roles: